You have no items in your shopping cart.
Description
Details
- Works with Mitel IP 5000 Series Phones (ie. 5312 5320 5320e 5324 5330 5330e 5340 5340e 5360)
- 2 FT Coiled | 12 FT Uncoiled
- one end with 3 inch and and another with 2 inch flat leader.
Specification
Additional Info
Weight | 1.0000 |
---|---|
Manufacturer | Mitel |
Color | Black |
Condition | New |
Factory Condition | Brand New. Original Retail Box. Factory Warranty Included |
Warranty | 1-Year Warranty |